Zijin Mining’s African Copper Hub Hit by Floods: 2025 Output Target Faces 28% Cut

Zijin Mining has announced a significant production setback at its Kamoa-Kakula copper mine in Africa, the continent’s largest, after a flooding incident slashed 2025 output targets by 28%. The accident, triggered by underground pumping facility damage from late-May mine earthquakes, has forced the company to revise its annual copper production plan from 520,000–580,000 tons to 370,000–420,000 tons.

Accident Details and Recovery Efforts
  • Causal Chain: Multiple mine earthquakes in the Kakula section caused roof collapses, damaging deep drainage systems and leading to rapid groundwater inundation in the eastern mining area.
  • Current Progress: The western zone, elevated at 1,110 meters, has restarted north/south mining operations. High-power water pumps are being installed for full drainage by August 2025.

 

Impact on Zijin’s Growth Strategy

Kamoa-Kakula, which contributed 194,700 tons of equity production in 2024, was slated to drive 75% of Zijin’s 2025 output growth (143,000-ton planned increase). The shortfall now threatens the company’s annual target of 1.15 million tons of mineral copper, as other mines like Chukalu-Peji and Kolwezi cannot offset the loss.

Mine Area Original 2025 Plan Current Status
Kamoa-Kakula +143,000 tons Output may lag 2024
Chukalu-Peji (Sey) Unchanged Unaffected
Kolwezi (Congo) +15,000 tons Unaffected
Emergency Response Measures

Zijin has activated a three-pronged plan:

  1. Western Zone Restart: Accelerating mining in the western area’s north/south sectors.
  2. Stockpiled Ore Utilization: Deploying 3.8 million tons of surface ore (3.2% grade) to maintain feedstock.
  3. High-Grade Block Development: Launching ultra-high copper grade projects for short-term output boosts.

While the Phase III concentrator and underground mining infrastructure remain intact, the 1.15-million-ton annual target hangs in the balance. The 44.44%-owned asset is expected to reduce Zijin’s equity production by 44,000–93,000 tons in 2025.

Contact us ↓

Annie Lu

Huatao Group

annie.lu@huataogroup.com

Mobile: 0086 18032422676 ( Whatsapp/Wechat/Viber)

https://wa.me/008618032422676

Web:www.tufflexscreen.com

www.huataoscreen.com

www.puscreenpanel.com

Our Hot-selling Products:

HUATAO Hot-Selling Polyurethane Product List as below:

Polyweb Urethane Screen Tufflex Screen
Polyurethane Dewatering Screen Mesh WS 85 Modular Screen
Polyurethane Screen Panels Rotex Replacement Screens
Rubber Screen Panel Vibrating Screen Mesh
Self cleaning Wire Mesh Shale Shaker Screen

mining news 2026 (8)

Tags:
avatar admin
personal profile

Products

Mining filter press cloth for copper concentrate and tailings dewatering

PP Filter Press Cloth

HUATAO PP Filter Press Cloth is engineered for efficient solid-liquid separation in mining, tailings, chemical processing and sludge dewatering. Available in monofilament, multifilament and customized woven structures, it provides reliable particle retention, chemical resistance, easy cake release and long-term filtration performance. Custom dimensions, feed holes, necks, edge sealing and fixing systems are available for chamber and membrane filter presses.
Horizontal vacuum belt filter rubber belt with drainage holes

Rubber Filter Belt for Horizontal Vacuum Belt Filters

HUATAO Rubber Filter Belts are engineered for horizontal vacuum belt filters used in mining, metallurgy, chemical processing and FGD applications. Customized drainage grooves, holes, reinforced carcass and rubber compounds provide efficient filtrate drainage, reliable vacuum sealing and long-term operation under abrasive and corrosive slurry conditions.
Ceramic Lagged Drive Pulley (5)

Ceramic Lagged Drive Pulley

Ceramic Pulley Lagging combines high-hardness alumina ceramic with resilient rubber to provide superior traction, abrasion resistance and reliable conveyor performance in demanding mining and bulk material handling applications.
fine gold recovery sluice box for alluvial mining

Vibrating Sluice Box

HUATAO Vibrating Sluice Box is a gravity separation solution designed for placer gold mining, alluvial gold recovery and fine gold concentration. It combines the basic recovery principle of a conventional gold sluice with controlled mechanical vibration or pulsating movement to keep the material bed active during processing.
Trailer mounted gold processing plant for remote placer mining

Compact Alluvial Gold Equipment

Our Small Gold Wash Plant is designed for small-scale gold miners, prospectors and contractors processing alluvial and placer gold deposits. The compact system integrates material feeding, washing, screening and gold recovery into a practical processing solution.
Gold centrifugal concentrator for alluvial gold processing plant

Centrifugal Gold Concentrator

Our Centrifugal Gold Concentrator is a high-efficiency gravity separation machine designed to recover free gold and other high-density valuable minerals from mineral slurries. By combining a high-speed rotating bowl with centrifugal force and controlled fluidization water, the machine significantly strengthens the density-based separation process compared with conventional gravity equipment.
product

Contact us

    Products
    Contacts
    WhatsApp
    Email