Mineral Technical News

300 TPH Granite Crushing Plant: Complete Equipment Cost Breakdown & Investment Strategy

Date Issued:2025-06-25

As urbanization accelerates, the demand for high-quality granite in construction continues to rise. A 300-ton-per-hour granite production line represents a significant investment, requiring meticulous planning of equipment configuration and budget allocation. This comprehensive guide unveils the machinery setup, cost dynamics, and strategic insights for maximizing return on investment.

1. Core Equipment for a 300 TPH Granite Line

1. Primary Crushing: Jaw Crusher

  • Function: Coarse crushing of large granite blocks (up to 1200mm)
  • Price Range: $42,000–$112,000 (USD), dependent on model (e.g., PE 1200×1500) and manganese steel liner quality.
  • Key Feature: High crushing ratio (4–6:1) and durable toggle plate design.

2. Secondary Crushing: Cone vs. Impact Crusher

  • Cone Crusher:
    • Ideal for hard granite (compressive strength >200MPa)
    • Price: $56,000–$140,000 (USD) for multi-cylinder hydraulic models
  • Impact Crusher:
    • Suits medium-hard materials, produces cubical aggregates
    • Price: $56,000–$140,000 (USD) with optional anti-abrasive rotor coatings

3. Sand Making: Vertical Shaft Impact (VSI) Crusher

  • Function: Manufactures construction-grade sand (0–5mm) with adjustable fineness modulus.
  • Price: $56,000–$140,000 (USD), influenced by rotor speed (400–1000rpm) and carbide tip configurations.

4. Screening & Auxiliary Systems

Equipment Price Range (USD) Technical Specs
Vibrating Screen $28,000–$70,000 3–5 layer designs with polyurethane screens for 95% screening efficiency.
Conveyor System $14,000–$70,000 Heavy-duty rubber belts (1000–1600mm width) with automatic tensioning.
Sand Washer $28,000–$56,000 Spiral or wheel type, reduces mud content to <0.5%.
Dust Collection $28,000–$112,000 Baghouse filters with 99.9% dust capture efficiency, compliant with EU emission standards.

2. Total Investment Landscape

Budget Ranges (USD)

  • Basic Configuration: $420,000–$700,000
    • Suitable for small quarries with manual operation.
  • Premium Setup: $700,000–$1.4 million
    • Includes PLC automation, remote monitoring, and energy-saving motors (IE3/IE4 standards).

Cost Allocation Breakdown

  • Crushing Equipment: 50–60% of total budget
  • Screening & Washing: 20–25%
  • Auxiliary Systems: 15–20%
  • Installation & Commissioning: 5–10%

3. Strategic Investment Tips

  1. Material Hardness Analysis:
    • Granite with quartz content >25% requires tungsten carbide-coated crusher components (adds 10–15% to equipment cost but reduces downtime by 30%).
  2. Energy Efficiency:
    • Opt for variable frequency drives (VFDs) on motors, which can lower electricity costs by $0.5–$1.0 per ton of granite processed.
  3. After-Sales Support:
    • Choose suppliers offering 24/7 maintenance hotlines and 1-year warranties on wear parts (e.g., crusher liners, screen meshes).

4. Case Study: ROI Projection

A 300 TPH line operating 10 hours/day, 25 days/month:

 

  • Annual Output: 75,000 tons
  • Revenue (avg. $30/ton): $2.25 million
  • Operating Costs: $1.2–$1.5 million (labor, power, maintenance)
  • Payback Period: 1.5–2 years for premium setups

Conclusion

Investing in a 300 TPH granite production line demands a strategic balance between equipment quality, operational efficiency, and environmental compliance. By prioritizing high-wear components, energy-saving technologies, and robust after-sales support, investors can optimize both short-term costs and long-term profitability.

 

Contact Huatao Group for a custom quote: annie.lu@huataogroup.com | www.tufflexscreen.com

* E-mail :

can not be empty

* Question :

can not be empty

Related News